Minto Group, 12-20 Cordova Avenue Condos
ETOBICOKE, ON
The 12-20 Cordova Avenue development in Toronto will feature a 27-storey residential tower designed to provide modern urban living in a prime location. With a total of 265 units, the development offers a diverse mix of residential suites, with accompanying amenities and parking to meet the needs of residents.
The project has the following key components:
Residential Units: A total of 265 residential suites, extending from the podium up to the 4th floor and continuing in the tower portion of the development from the 5th floor onwards.
Parking: A 5-level underground parking garage spanning the footprint of the development, providing 10,270 square meters (110,550 square feet) of parking space. This facility will include a loading dock area at grade to support operational needs.
Lobby and Amenities: The ground level will feature a residential lobby and an indoor amenity area, offering residents a welcoming space and essential facilities to enhance their living experience.
Building Area: The total gross floor area (GFA) of the development will range between 24,154 and 25,083 square meters (260,000 to 270,000 square feet), maximizing the potential of the site while contributing to the urban fabric of the neighborhood.
The tower portion of the development will rise above a podium, creating a visually distinctive structure with residential spaces on the upper floors. Designed to integrate seamlessly with the surrounding community, this project will provide much-needed housing options in a growing urban environment.
Services Provided: Mechanical and Electrical Engineering Sustainability and Energy Modelling

