Unparalleled Expertise
Toronto Transit Commission Green Bus Program
The Toronto Transit Commission’s Green Bus Program identifies a procurement strategy to transition the fleet to become zero-emissions by the year 2040 by expanding the fleet to maximize the use of electrically powered buses.
Metrolinx, Ontario Line Subway Station
The 15.6-kilometer, 15-stop Ontario Subway Line creates faster easier connections to travel within Toronto and beyond.
Regus Business Solutions
Regus Office Solutions - Mechanical and Electrical Engineering Standing Offer.
RBC National Retail Program
RBC, after numerous years of observation, set out to modernize and upgrade most of their branches across Canada, starting in 2019.
Minto Group’s The Saint, 89 Church Street
New 312,200 sq. ft., 407-unit, 46-storey residential tower with 6-levels of parking and ground floor retail space.
Concord Sky Development
This 85-storey development includes 1,106 units, with a gross construction area of 1,343,917 sq. ft., a condominium building with Toronto Green Standard Tier 1 specific energy design target requirements.
Allied Properties REIT Data Centre
This upgrade involved the addition of a Tier III data centre within an existing 10,000 sq. ft. included overhead power busway for rack distribution, high and low-density areas, dedicated 2N-redundant UPS distribution and N+1-redundant generator plant.
eStruxture Tier 2 Data Centre
Quasar led the full Commissioning team with a comprehensive scope encompassing Witness and Verification Testing and Commissioning of a new Uptime Institute Tier 2 Data Centre
BMO SCC Data Centre
BMO underwent a project to convert approximately 5,000 sq. ft. of existing office space to new white space and supporting mechanical and electrical infrastructure.
Montage Cay Bahamas
Ultra-luxury mixed-use development with 27 private estates, 18 villas, 65-room hotel plus amenities including spa, fitness, food and beverage facilities all integrated into a private island with multiple beaches.
Six Senses Belize Resort
New ultra-luxury resort development in Belize. The project site includes two parcels: Cayo Rosario Island – a private island to be developed with 40 over water villas, 16 private residences, restaurants, spa, pool, and other amenity spaces; Secret Beach – an oceanside site to be developed with 25 private residences, amenity spaces, and central infrastructure plants.
Humber College International Graduate School
Vendor of Record for full design services (Design Development, Contract Documents, Contract Procurement, and Contract Administration) on Humber College's new urban campus for the International Graduate School in downtown Toronto.
York University – ADERSIM Laboratory and Emergency Operations Centre
Renovation within the existing basement of the Schulich Building, to include a new Emergency Operations Centre and Dual-Purpose Simulation (Research) Classroom Space, Meeting Rooms, Office Space, New Staff Lounge, Kitchenette, washrooms, and associated ancillary support space.
Natural Sciences and Engineering Research Council of Canada Office Reno @ Zibi
Total building fit-up of purpose-built eight-storey building for Natural Sciences and Engineering Research Council of Canada (NSERC).
Welland Fire and Emergency Headquarters and Training Centre
Design-build of new 28,300 sq. ft. fire and emergency headquarters and training centre. The facility includes a main lobby, training facility and classrooms, administrative, fire prevention, and training offices, five (5) drive-thru service bays, a multi-storey design, and storage areas.
Mississauga Office Building
Site Plan Approval, Conceptual Design, Working Drawings, and Construction Administration for the Core and Shell Construction of a new 6-storey, 70,000 sq. ft. commercial building with a mechanical penthouse.
Lakeridge Gardens Accelerated Long-Term Care Home
Lakeridge Gardens is a new state-of-the-art, 6-storey, 275,000 sq. ft., long-term care home with 320 beds, developed under an accelerated build pilot program built next to the Ajax Pickering Hospital.